|
Simple 2 Chute Finish
Line |
|
 |
| All personnel as displayed are
considered necessary. The number of chute packers required will vary
according to runner density at the finish line. As runner density
approaches 30 per minute, multiple gender chutes with swing ropes will
be necessary. |
| PT = Primary Timer |
BU = Backup Timer |
| CP = Chute Packer |
BT = Bib Taker |
| SP = Spindle Manager |
BR = Bib Runner |
| TD = Traffic Director |
|
|